Mašina za rezanje papira small cutting flowline Polar Mohr with Cutter 115 EM-Mon, Lift, Jogger za prodaju na Truck1 Crna Gora, ID: 8790304

small cutting flowline Polar Mohr with Cutter 115 EM-Mon, Lift, Jogger

: fotografija u zaglavlju
Mašina za rezanje papira small cutting flowline Polar Mohr with Cutter 115 EM-Mon, Lift, Jogger

Mašina za rezanje papira small cutting flowline Polar Mohr with Cutter 115 EM-Mon, Lift, Jogger

Objavljeno: 11m 30d

PDF
Mašina za rezanje papira small cutting flowline Polar Mohr with Cutter 115 EM-Mon, Lift, Jogger: slika 1
Mašina za rezanje papira small cutting flowline Polar Mohr with Cutter 115 EM-Mon, Lift, Jogger: slika 2
Mašina za rezanje papira small cutting flowline Polar Mohr with Cutter 115 EM-Mon, Lift, Jogger: slika 3
Mašina za rezanje papira small cutting flowline Polar Mohr with Cutter 115 EM-Mon, Lift, Jogger: slika 4
Mašina za rezanje papira small cutting flowline Polar Mohr with Cutter 115 EM-Mon, Lift, Jogger: slika 5
Mašina za rezanje papira small cutting flowline Polar Mohr with Cutter 115 EM-Mon, Lift, Jogger: slika 6
Mašina za rezanje papira small cutting flowline Polar Mohr with Cutter 115 EM-Mon, Lift, Jogger: slika 7
Ask for all available pictures

Objavljeno: 11m 30d

PDF
Brend

Referentni broj

54127
Godina proizvodnje

1987
Lokacija

Njemačka, Dabergotz 16818 , Bahnhofstrasse 13 a, Germany
Dodatno
dostupne jedinice

1
Više informacija

small cutting flowline Polar Mohr with Cutter 115 EM-Mon, Lift, Jogger

age 1987

with

Fork stack lift Polar

with

Jogger Polar R-4

and

Cutter Polar 115 EM-Mon

size 115 cm

Programs with monitor

chromed Airtable

2 knifes

in verry good working conditon

Kontaktirajte prodavca

The administrator of personal data submitted in the above form is AMARON FZCO, Registration Number DSO-FZCO-40745, with its registered office at 42902 - 001, IFZA Business Park, DDP, Dubai, UAE. E-mail contact: info@truck1.eu.
Personal data are processed for the purpose of handling the inquiry submitted via the form. Depending on the user’s location, the processing of data is carried out in accordance with:
• Article 6(1)(f) of the GDPR – for users located in the European Economic Area (EEA), where processing is based on our legitimate interest in responding to inquiries;
• Applicable data protection laws of the United Arab Emirates or other relevant jurisdictions – for users outside the EEA.
Each user has the right to request access to their personal data, rectification, erasure (where justified), restriction of processing, and objection to processing. Users in the EEA also have the right to lodge a complaint with the competent supervisory authority. More information on how we process personal data can be found in our Privacy Policy available on the website.

Ova ponuda je isključivo informativnog karaktera. Molimo potvrdite detalje direktno od prodavca.

Saveti za kupovinu
Korak 1 Izaberite vaš način kontakta

Nakon što identifikujete vozilo koje vas zanima na Truck1.eu, imate opciju da kontaktirate prodavca putem kontakt forme ili direktno pozivom prodavcu koristeći dati broj telefona. Izaberite metodu koja najbolje odgovara vašim preferencijama.

Korak 2 Proverite detalje vozila

Kontaktirajte prodavca kako biste zatražili dodatne informacije o dostupnosti vozila, tehničkom stanju i stvarnoj ceni, jer oglasi možda ne pružaju uvek potpune informacije. Takođe, zatražite najnovije servisne zapise ili izveštaje o inspekciji kako biste dobili jasniju sliku o trenutnom stanju vozila.

Korak 3 Iskoristite alat za upoređivanje

Iskoristite funkciju upoređivanja na Truck1 da procenite slična vozila. Ovo će vam pomoći da procenite da li je tražena cena konkurentna i u skladu sa tržišnim trendovima. Potražite obrasce u cenama i karakteristikama kako biste doneli informisanu odluku.

Korak 4 Proverite reputaciju prodavca

Kada kupujete vozilo online, važno je proveriti reputaciju prodavca tražeći pozitivne kritike i istoriju uspešnih transakcija. Ikone "Status prodavca" na Truck1 pružaju vredne informacije na osnovu iskustava sa prodavcem, pomažući vam da procenite pouzdanost prodavca.

Korak 5 Pregledajte vozilo

Kada god je moguće, prioritet dajte poseti prodavcu i ličnom pregledu vozila. Ako je moguće, organizujte pre-kupovnu inspekciju od strane treće strane. Ovo može otkriti potencijalne probleme koji možda nisu vidljivi na fotografijama ili navedeni u oglasu.

Korak 6 Potpišite ugovor o prodaji

Uverite se da potpisujete detaljan ugovor o prodaji kako biste zaštitili svoja prava i potvrdili uslove transakcije.

Korak 7 Obezbedite plaćanje

Nastavite sa plaćanjem samo nakon potpisivanja ugovora o prodaji. Uobičajeno je dati mali depozit za rezervaciju vozila, ali to treba učiniti oprezno.

Saveti protiv prevara
Korak 1 Proverite Identitet Prodavca

Potvrdite autentičnost prodavca prikupljanjem detaljnih informacija i proverom recenzija ili ocena ranijih kupaca. Potražite ikone prodavaca na Truck1 kako biste identifikovali verifikovane prodavce i osigurali sigurnije iskustvo kupovine.

Korak 2 Detaljno Poređenje Cene

Koristite alat za poređenje kako biste uporedili cene sličnih vozila i identifikovali bilo kakve neobične ponude. Budite oprezni s cenama koje znatno odstupaju od tržišnog standarda, jer mogu ukazivati na potencijalne probleme ili prevaru.

Korak 3 Kontaktirajte Prodavce za Detaljne Informacije

Zatražite od prodavca detalje o istoriji vozila i uslovima korišćenja. Pravi prodavac će biti transparentan i voljan da podeli ove informacije, pomažući vam da procenite da li vozilo odgovara vašim potrebama.

Korak 4 Proverite Stanje Vozila

Organizujte pregled i testiranje vozila, tražeći znakove habanja ili oštećenja. Razmislite o pre-kupovnoj inspekciji od strane profesionalnog mehaničara kako biste otkrili skrivene probleme i osigurali bezbednost i pouzdanost vozila.

Korak 5 Osigurajte Jasan Ugovor o Prodaji i Proces Plaćanja

Pre bilo koje transakcije, osigurajte da postoji detaljan ugovor o prodaji koji definiše sve uslove i odredbe. Koristite sigurne metode plaćanja i proverite detalje transakcije kako biste se zaštitili od prevara.

Njemačka, Dabergotz 16818 , Bahnhofstrasse 13 a, Germany
06:17 Ne
Pouzdan
2 Više od 2 godine sa Truck1
Kontaktirajte prodavca

The administrator of personal data submitted in the above form is AMARON FZCO, Registration Number DSO-FZCO-40745, with its registered office at 42902 - 001, IFZA Business Park, DDP, Dubai, UAE. E-mail contact: info@truck1.eu.
Personal data are processed for the purpose of handling the inquiry submitted via the form. Depending on the user’s location, the processing of data is carried out in accordance with:
• Article 6(1)(f) of the GDPR – for users located in the European Economic Area (EEA), where processing is based on our legitimate interest in responding to inquiries;
• Applicable data protection laws of the United Arab Emirates or other relevant jurisdictions – for users outside the EEA.
Each user has the right to request access to their personal data, rectification, erasure (where justified), restriction of processing, and objection to processing. Users in the EEA also have the right to lodge a complaint with the competent supervisory authority. More information on how we process personal data can be found in our Privacy Policy available on the website.

Ova ponuda je isključivo informativnog karaktera. Molimo potvrdite detalje direktno od prodavca.

Saveti za kupovinu
Korak 1 Izaberite vaš način kontakta

Nakon što identifikujete vozilo koje vas zanima na Truck1.eu, imate opciju da kontaktirate prodavca putem kontakt forme ili direktno pozivom prodavcu koristeći dati broj telefona. Izaberite metodu koja najbolje odgovara vašim preferencijama.

Korak 2 Proverite detalje vozila

Kontaktirajte prodavca kako biste zatražili dodatne informacije o dostupnosti vozila, tehničkom stanju i stvarnoj ceni, jer oglasi možda ne pružaju uvek potpune informacije. Takođe, zatražite najnovije servisne zapise ili izveštaje o inspekciji kako biste dobili jasniju sliku o trenutnom stanju vozila.

Korak 3 Iskoristite alat za upoređivanje

Iskoristite funkciju upoređivanja na Truck1 da procenite slična vozila. Ovo će vam pomoći da procenite da li je tražena cena konkurentna i u skladu sa tržišnim trendovima. Potražite obrasce u cenama i karakteristikama kako biste doneli informisanu odluku.

Korak 4 Proverite reputaciju prodavca

Kada kupujete vozilo online, važno je proveriti reputaciju prodavca tražeći pozitivne kritike i istoriju uspešnih transakcija. Ikone "Status prodavca" na Truck1 pružaju vredne informacije na osnovu iskustava sa prodavcem, pomažući vam da procenite pouzdanost prodavca.

Korak 5 Pregledajte vozilo

Kada god je moguće, prioritet dajte poseti prodavcu i ličnom pregledu vozila. Ako je moguće, organizujte pre-kupovnu inspekciju od strane treće strane. Ovo može otkriti potencijalne probleme koji možda nisu vidljivi na fotografijama ili navedeni u oglasu.

Korak 6 Potpišite ugovor o prodaji

Uverite se da potpisujete detaljan ugovor o prodaji kako biste zaštitili svoja prava i potvrdili uslove transakcije.

Korak 7 Obezbedite plaćanje

Nastavite sa plaćanjem samo nakon potpisivanja ugovora o prodaji. Uobičajeno je dati mali depozit za rezervaciju vozila, ali to treba učiniti oprezno.

Saveti protiv prevara
Korak 1 Proverite Identitet Prodavca

Potvrdite autentičnost prodavca prikupljanjem detaljnih informacija i proverom recenzija ili ocena ranijih kupaca. Potražite ikone prodavaca na Truck1 kako biste identifikovali verifikovane prodavce i osigurali sigurnije iskustvo kupovine.

Korak 2 Detaljno Poređenje Cene

Koristite alat za poređenje kako biste uporedili cene sličnih vozila i identifikovali bilo kakve neobične ponude. Budite oprezni s cenama koje znatno odstupaju od tržišnog standarda, jer mogu ukazivati na potencijalne probleme ili prevaru.

Korak 3 Kontaktirajte Prodavce za Detaljne Informacije

Zatražite od prodavca detalje o istoriji vozila i uslovima korišćenja. Pravi prodavac će biti transparentan i voljan da podeli ove informacije, pomažući vam da procenite da li vozilo odgovara vašim potrebama.

Korak 4 Proverite Stanje Vozila

Organizujte pregled i testiranje vozila, tražeći znakove habanja ili oštećenja. Razmislite o pre-kupovnoj inspekciji od strane profesionalnog mehaničara kako biste otkrili skrivene probleme i osigurali bezbednost i pouzdanost vozila.

Korak 5 Osigurajte Jasan Ugovor o Prodaji i Proces Plaćanja

Pre bilo koje transakcije, osigurajte da postoji detaljan ugovor o prodaji koji definiše sve uslove i odredbe. Koristite sigurne metode plaćanja i proverite detalje transakcije kako biste se zaštitili od prevara.

 Call
Klikom na bilo koji link na ovom sajtu, potvrđujete svoj pristanak i dozvolu za obradu Vaših ličnih podataka, uključujući upotrebu kolačića i drugih tehnologija praćenja. Namera je da poboljšate i personalizujete Vaše iskustvo na ovom sajtu, našim drugim sajtovima i sajtovima oglašivača trećih strana koji rade sa nama. Naše partnerske kompanije takođe mogu da skladište kolačiće na Vašem uređaju ili da koriste slične tehnologije za prikupljanje i obradu ličnih podataka. Saznajte više o tome kako obrađujemo Vaše lične podatke.
t1 old test unit
t1 test unit - Industrial equipment
t1 test unit - 3p Vertriebsgesellschaft mbH